
The entire project was completed independently by the children working together, and it is the first construction project at the camp!!!
Thank all those who contributed to this project—your wisdom and efforts have created our pride.


-First, a suitable location was selected at the camp. The key is to ensure sports safety and avoid damage to the surrounding area, so I chose an open space behind the camp.
-The purchase list includes wood that meets the standard height, cement and sand for fixing the basketball hoop, and spray paint for coating.

PG:Sawing Wood C:Building the Foundation
SF:Making the Backboard
PF:Coating the Bracket SG:Installation

The depth of the holes dug by Group C depends on the weight and length of the wood prepared by Group PG. When Group SF and Group PF are coating the pillars and backboard simultaneously, they must maintain a consistent color tone.
During installation, personnel from multiple directions need to work together to control the level, and those filling cement must coordinate their work at the same time. All tasks are closely connected—just like a basketball team, the team can only achieve success by advancing and retreating together.